Projects

Autonomous pilot nodes validating distributed, resilient self-consumption before scaling across the Philippines and beyond.

Pilot Nodes

Pilot Node 1 Under development

Tarlac Solar Self-Consumption Project

A distributed self-consumption node in Tarlac Province — validating MLPE architecture, local operational autonomy, and cost reduction under Philippine grid conditions. Engineering review and site assessment in progress.

Pilot Node 2 In preparation

Community Facility Project

A community facility exploring resilient self-consumption for a public-interest organisation — generation at the point of use, loosely coupled to local maintenance capability. Site selection ongoing.

Future Deployment

Following pilot validation, autonomous nodes scale to facility types where distributed generation and grid resilience deliver the most value.

Schools

Local generation for education facilities — reducing cost and grid dependency.

Under discussion

Churches

Resilient power for community anchors during outages and storms.

Under discussion

Commercial Facilities

Distributed self-consumption reducing operational exposure to tariff volatility.

Planned

Warehouses

Large-roof distributed arrays with MLPE — limiting single-point failure risk.

Planned

Rural Infrastructure

Autonomous nodes where transmission infrastructure is weak or unreliable.

In preparation